Canvas: made to order, currently 4-6 weeks Lift parts: about 1–2 weeks

Goshen Stamping Lift System Guide

Parts for this guide: Goshen Lift System Shop Goshen Lift System →

Since 1976, Goshen Stamping has made the most popular lift system for pop-up tent campers in the industry. This system is known for being easy to install, maintain, and repair. A single main cable operates the spring push system and can be driven by a hand-crank brake winch or an approved motorized winch.

Compatible Trailer Manufacturers

  • Camplite/Damon (since 1993)
  • Dutchmen (1993–2003)
  • Forest River (since 1993)
  • Palomino (since 1987)
  • Rockwood/Flagstaff (some models since 1994)
  • Skamper (since 1977)
  • Starcraft (1993–2008)
  • Sunlite (1987–1994)
  • Sylvan Sport (since 2008)
  • Van American/Cobra (1989–1990)
  • Viking (since 1995)

Diagrams & Identification

Quick ID: Corner posts square = 1473 Series. Corner posts rectangular = 2660 Series.

1473 Series (Square posts)
Diagram of the Goshen 1473 Lift System with square posts
2660 Series (Rectangular posts)
Diagram of the Goshen 2660 Lift System with rectangular posts

The letter call-outs on these diagrams — (K) tie bar, (L) master tube, (M) adjustable pulley, (N) rear spring tubes, (P) spring, (Q) safety post, (S) front spring tubes — are referenced in the repair procedures below.

Goshen Lift System — Overview

How it works: One 3/16" main cable drives a greased Master Tube with two chambers. Pusher plates move heavy springs through corner guide tubes into the telescoping lift arms (front on lower chamber, rear on upper).

  • Front/Rear height: Adjust at the reversing pulley on the rear crossmember.
  • Side-to-side: Correct by trimming spring length (no per-corner adjusters).
  • Leveling: Always level the camper before operating to prevent lift-post binding.
Goshen Lift System — Parts

Safety Posts (order two)

Version Length Lift-Arm Width Order Here
147343 3/4"1 1/2"Click here
147348 1/2"1 1/2"Click here
147349"1 1/2"Click here
266043 1/2"3 1/4"Click here
266046"3 1/4"Click here
266049"3 1/4"Click here
266051"3 1/4"Click here

How to choose: With the roof fully up and the door properly seated, measure lift-arm width and the required post length for your series. Most setups use two posts.

Roof Height Gauge Cables

Length Color Order Here
45"RedCurrently N/A
48"YellowCurrently N/A
49"GreenCurrently N/A

How to choose: With the roof fully up and the door seated, measure from the roof extrusion to the camper body and select the closest cable length.

Master Tubes

Length Order Here
52" (3-stage post)Click here
55" (4-stage low profile)Click here

Note: Master Tube length affects replacement main-cable length. Measure carefully before ordering.

Shop Goshen parts · Need help selecting the right parts?

Goshen Lift System — Maintenance (5 Key Tips)
  1. Grease the Master Tube chambers annually. Use chassis grease via each zerk until clean grease exits the chamber ends (typically ~14 oz per chamber). Do both chambers (front = lower, rear = upper).
  2. Oil corner guide tubes (weep holes), if equipped. A few pumps of light oil reduce spring friction. Temporarily plug the hole to let oil wick in; remove the plug later.
  3. Manual winch (DLB-series): Light silicone at the main bushing and drum. Avoid the leather brake disc—it must remain dry to hold the roof.
  4. Power winch (Carefree/Powerwinch): Remove the lower pan and lightly silicone around the drum. Do not get lubricant on the pawl/clutch assembly or limit-switch components.
  5. Lift posts & setup: If posts stick when lowering, use paraffin wax or silicone on telescoping sections (shield canvas). Always level the camper before operating.
Manual brake winch (DLB800A / DLB1200A)
  • “A” models (2000+) are supported; pre-2000 DLB800/1200 parts are largely discontinued.
  • On pop-ups, the standard crank handle is replaced by a Goshen extension hub (hub, spring, nut).
  • Common service items: brake pad, drive shaft, bushings, cable keeper, extension-hub hardware.
Power winch (Carefree / Powerwinch)

We do not sell electric winches. For complete units and brand-specific parts (e.g., Carefree P55012 / Powerwinch P92001), please contact an authorized Carefree/Powerwinch dealer or your local RV parts retailer.

Tip: If your roof struggles to move, service the Goshen lift system first (grease, posts, pulleys) before diagnosing the motor, clutch, relay pack, or limit switches.

Measure for a replacement main cable (summary)
  1. Winch to the front of the Master Tube.
  2. Master Tube length (52" or 55").
  3. Back of Master Tube, around the rear pulley, and back to the tube. Be precise; custom cables are not returnable.

Repair Procedures
Spring Replacement Procedure
Quick links:  Goshen Springs  •  Spring Tubes

Important: The roof should be in the DOWN position before beginning this procedure to release pressure from the system. Complete one end of the camper at a time. Letters like (K) refer to the series diagrams in Diagrams & Identification above.

  1. Remove the tie plate by removing (2) self-tapping screws. Refer to (K) on the diagram.
  2. Remove the two (2) screws attaching the spring tubes to the master tube (L).
  3. Remove two (2) screws each from the floor plates (N) attaching spring tubes to the frame.
  4. Pull the spring (P) out from the bottom of the telescoping posts (A, B, & C).
  5. Pull the spring tube off the spring.
  6. Pull the spring assembly (2 springs attached) out of the master tube (L).
  7. Insert new spring assembly into the master tube until it reaches the stop. Ensure cable slides freely between springs.
  8. Slide the spring tubes onto the springs. (Add oil inside tube if needed.)
  9. Attach the spring tubes to the camper frame corners.
  10. Reconnect the spring tubes to the master tube.
  11. Reattach the tie bar.
  12. Repeat steps for opposite end if needed.

Note: If you have a Dutchmen unit with a rear-mounted winch, these instructions should be reversed.

Main Cable Replacement Procedure
Quick links:  Goshen Main Cable

Letters like (M) refer to the series diagrams in Diagrams & Identification above.

  1. Start with rear tubes. Follow spring steps 1, 2, 3, 4, and 6 above.
  2. Hold spring pair, lay crimped cable and pusher plate over springs, and insert both into master tube.
  3. Run cable around pulley (M), insert into master tube, and feed forward. Clear grease if necessary.
  4. Ensure pusher plate is in front of the springs.
  5. Wrap cable once around winch drum, secure under cable keeper (I), and tighten bolt (T) securely — see the cable attachment method inset on the diagram.
  6. Reassemble spring tubes, master tube, and tie plate.

Your system should now be ready. You can add new grease to the master tube. If the front and back of the roof do not raise evenly, adjust the pulley (M).

Not sure which part you need, or stuck on a step? Contact us & fitment help

Shop Goshen Lift System →